PRODUCTION ENGINEERING MEASURE FOR TYPE FW-202 BARRIER GRID STORAGE TUBE
Abstract
Efforts were continued on a production engineer ing measure for the FW-202 barrier grid storage tube. Testing was completed on the six engineer ing samples. Improved processes on the elec trophoretic deposition of the SG-67 frit has appreciably reduced the number of blemishes on the target surface. The use of nickel seed mesh in place of the copper seed mesh has resulted in a greater yield of good targets.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 10, 1963
- Accession Number
- AD0404096
Entities
People
- J. M. Abraham