7486 CERAMIC TRIODE, PRODUCTION ENGINEERING MEASURE
Abstract
Efforts were continued on improving processing equipment and techniques for the production of triode tube type 7486. Life testing was completed for evaluation of the present product. Testing of heater design changes was completed. Effects of new cathode spray masks were evaluted. Construction of tubes containing design changes was started and life testing will soon begin.
Document Details
- Document Type
- Technical Report
- Publication Date
- Mar 31, 1963
- Accession Number
- AD0404516
Entities
People
- J. D. Marshall
Organizations
- General Electric