SUPER-POWER KLYSTRON TUBE-TEST FACILITY

Abstract

During this quarter, equipment installation and interconnection was completed with the exception of the crowbar. The interim modulator tests were completed, and the modulator was delivered and interconnected with the remainder of the system. All system interconnection wiring and piping were completed and tested. The beam supply tests were completed into a dc dummy load and this portion of the system performed satisfactorily. The bias supply, resistors, bushings and covers associated with the klystron/modulator tank were installed and tested. The crowbar fabrication was completed and preliminary tests are being conducted.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1963
Accession Number
AD0404708

Entities

People

  • R. L. Blessing

Tags

Communities of Interest

  • Advanced Electronics
  • Energy and Power Technologies
  • Human Systems

DTIC Thesaurus Topics

  • Capacitors
  • Circuit Breakers
  • Circuits
  • Engineering
  • Engineers
  • Fabrication
  • Filament Transformers
  • High Voltage
  • Measurement
  • Power Supplies
  • Production Engineering
  • Pulse Transformers
  • Radiation
  • Switches
  • Test Facilities
  • Transformers
  • Wiring Diagrams

Fields of Study

  • Physics

Readers

  • Electrical Engineering
  • Electronics Engineering
  • Software Engineering