VAFB ACCEPTANCE/DEMONSTRATION PROGRAM PLAN

Abstract

The information and requirements presented as they apply to the assembly and checkout contractor (Boeing) meet the objectives for technical approval, inventory, acceptance, and delivery/turnover of the Minuteman Wing II WS-133A Weapon System Facilities at VAFB. The methods to be used by Boeing to modify and demonstrate the weapon system using supporting technical manuals and implement the acceptance and delivery/turnover of the weapon system to the procuring authority was described. The remaining facilities under SAC control requiring modification (e.g. SMSA) will be modified by the use of a separately negotiated time compliance technical order and will not be included. The delivery/turnover activities described also pertain to only the Wing II LF(s) since the Wing II supporting facilities which were not yet in SAC's custody will remain in the custody of Boeinhe end of the Wing II Program in order to support the Wing III Program.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Feb 19, 1963
Accession Number
AD0404745

Entities

People

  • J. C. Hindmarch
  • R. V. Smith

Organizations

  • Boeing

Tags

Communities of Interest

  • Energy and Power Technologies
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Acceptance Tests
  • Air Flow
  • Air Force
  • Air Force Facilities
  • Air Force Personnel
  • Ballistic Missiles
  • Contractors
  • Contracts
  • Control Systems
  • Data Processing
  • Data Processing Equipment
  • Processing Equipment
  • Quality Control
  • Test Equipment
  • Test Sets
  • Warning Systems
  • Weapon Systems

Readers

  • Aerospace Test and Evaluation
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Government Contracting/Procurement.