PRODUCTION ENGINEERING MEASURE FOR A PHASE 2 SUPER POWER HYDROGEN THYRATRON TUBE

Abstract

Based on experience obtained with the first two tubes constructed under this contract, three additional tubes per design A were built during the fourth quarter period covered by this report. They were made with a heavier flange and different seal for the anode. Owing to this change, assembly of the tube was made safer and more flexible, and better alignment between sub assemblies and more accurate inspection became possible during assembly. Exhaust and thorough baking did not affect these tubes in any notice able way. Operating characteristics were investigated and found to possess satisfactory re producibility. Two tubes were operated success fully at the power level of the Stanford linear accelerator (epy 40KV; Ib 4.0 Adc; ib 3000a). Construction of the test equipment is proceeding.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Mar 01, 1963
Accession Number
AD0405484

Entities

People

  • H. E. Krefft

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Assembly
  • Construction
  • Contracts
  • Cooling
  • Detectors
  • Electron Tubes
  • Engineering
  • Engineers
  • Grids
  • Industrial Preparedness
  • Linear Accelerators
  • New Jersey
  • New York
  • Power Levels
  • Production
  • Production Engineering
  • Systems Engineering

Readers

  • Electrical Engineering
  • Snow Cover Descriptors for Reptiles and Their Illustrations.
  • Systems Analysis and Design