TEST PLAN CUT-UP MOTOR SD-25
Abstract
The purpose of this report is to present a logical means of dissecting and testing Minuteman third stage M-57E1 Rocket Motor samples. This test plan outlines the test objectives, motor cut-up sequences, sample machining procedures, chemical and physical testing requirements to be followed for motor cut-up SD-25. The prime objective of this test is the determination of case- bond strength and propellant physical properties.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 01, 1963
- Accession Number
- AD0405546