SITE ACCEPTANCE TEST PROCEDURES WHITEMAN AFB
Abstract
The acceptance tests required are specified for the checkout of equipment assembled into a Minuteman Missile System at Whiteman AFB preparatory to the eventual acceptance of the Flights, Squadrons + the entire Wing. Procedure documents required for the certification of Assembly and Checkout (ACO) test equipment as well as the documents required for checkout of OGE and MGE equipment are called out herein.
Document Details
- Document Type
- Technical Report
- Publication Date
- May 20, 1963
- Accession Number
- AD0405933
Entities
Organizations
- Boeing