PRODUCTION ENGINEERING MEASURE. MECHANIZATION FOR 2N559 AND 2N1094 TRANSISTORS. PHASE 1

Abstract

During development of the Nike Zeus anti-missile missile, it became apparent that large quantities of 2N559 and 2N1094 transistors would be needed as part of this system. Production was expanded to provide mechanized equipment for high-volume production of 2N559 and 2N1094 transistors. During Phase 1 of the 2N559-2N1094 Mechanization Program, 22 machines for 20 manufacturing opera tions were built. This report reviews the work done during Phase 1, April 30, 1959 to December 31, 1962, while developing and testing the machines. Each mechanized operation is described; problems encountered during development and operation of the machine are reviewed; mechanized operations are evaluated; and recommendations for further developments and refinements are presented. A 2N559 pilot production run and four mechanized production runs - for 2N560, 2N1051, 2N1094, and 2N1195 transistors - demon strated the production capability of the mechanized line. Distribution of Group A electrical parameters and summaries of Group B tests presented in this report indicate the quality of the five transistor types as Phase 1 ended.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Dec 31, 1962
Accession Number
AD0406465

Entities

People

  • M. N. Reppert

Tags

Communities of Interest

  • Advanced Electronics

DTIC Thesaurus Topics

  • Accuracy
  • Chemistry
  • Computer Programming
  • Control Panels
  • Data Processing
  • Fabrication
  • Geometry
  • Manufacturing
  • Materials
  • Measurement
  • Mechanics
  • Production
  • Production Control
  • Semiconductor Devices
  • Semiconductors
  • Test And Evaluation
  • Test Equipment

Readers

  • Semiconductor Device Technology
  • Software Engineering