WS-133A MAINTAINABILITY PROGRESS REPORT
Abstract
This document is the fifth of the monthly re ports that outline the progress achieved in the WS-133A Maintainability Program. The first report covered the period from 18 October 1962 thru 31 December 1962. Each succeeding report covers a monthly period from the first thru the last day of each month. This report covers the month of April 1963. The Maintainability Program Plan for the Minuteman Weapon System is two-fold; it provides both a Design Review and Evaluation Plan and a Test and Demonstration Plan. The monthly reports contain status of progress and problem areas encountered in each of these plans.