SITE ACCEPTANCE TEST PROCEDURES - WARREN AIR FORCE BASE

Abstract

The purpose of this document is to specify the acceptance tests required for the checkout of equipment assembled into a Minuteman missile system by the Boeing Company at Warren AFB preparatory to the eventual acceptance of the Flights, Squadron and the entire Wing. Procedure documents required for the certification of Assembly and Checkout (ACO) test equipment as well as the documents required for checkout of OGE and MGE equipment are specified in this report.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1963
Accession Number
AD0407785

Entities

Organizations

  • Boeing

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • Acceptance Tests
  • Actuators
  • Control Systems
  • Electron Tubes
  • Electronic Equipment
  • Generators
  • Launch Tubes
  • Measurement
  • Munitions
  • Oscillators
  • Power Supplies
  • Rocket Engines
  • Simulators
  • Software Testing
  • Telemetry Equipment
  • Test Equipment
  • Test Sets

Readers

  • Aerospace Test and Evaluation
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.