SITE ACCEPTANCE TEST PROCEDURES - WARREN AIR FORCE BASE
Abstract
The purpose of this document is to specify the acceptance tests required for the checkout of equipment assembled into a Minuteman missile system by the Boeing Company at Warren AFB preparatory to the eventual acceptance of the Flights, Squadron and the entire Wing. Procedure documents required for the certification of Assembly and Checkout (ACO) test equipment as well as the documents required for checkout of OGE and MGE equipment are specified in this report.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1963
- Accession Number
- AD0407785
Entities
Organizations
- Boeing