DOCK REQUIREMENTS SCHEDULE - STATUS/SHORTAGE. REPORT FOR GFP - VAFB WINGS III - V
Abstract
This volume specifies the Government Furnished Property (GFP) required by the Wings III thru V Vandenberg Air Force Base (VAFB) Test Program Contractor, The Boeing Company, for the Minuteman Program. The scope of this document is to provide identification of items of GFP by certain classifications, Figure A designation and/or part number, nomenclature, and configuration. In addition the scope includes provision for schedule of quantities required together with on-site-need dates. The following types of material are listed: Aero-Space Ground Equipment, Airborne Equipment, GEEIA, SAC, + FCR Installed Items, Time Compliance Technical Orders, Technical Order Items Required for Validation and Verification, and Non-Figure A Items Required for Validation and Verification.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 10, 1963
- Accession Number
- AD0408426
Entities
People
- L. J. Singer
Organizations
- Boeing