DOCK REQUIREMENTS SCHEDULE - STATUS/SHORTAGE. REPORT FOR GFP - VAFB WINGS III - V

Abstract

This volume specifies the Government Furnished Property (GFP) required by the Wings III thru V Vandenberg Air Force Base (VAFB) Test Program Contractor, The Boeing Company, for the Minuteman Program. The scope of this document is to provide identification of items of GFP by certain classifications, Figure A designation and/or part number, nomenclature, and configuration. In addition the scope includes provision for schedule of quantities required together with on-site-need dates. The following types of material are listed: Aero-Space Ground Equipment, Airborne Equipment, GEEIA, SAC, + FCR Installed Items, Time Compliance Technical Orders, Technical Order Items Required for Validation and Verification, and Non-Figure A Items Required for Validation and Verification.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Apr 10, 1963
Accession Number
AD0408426

Entities

People

  • L. J. Singer

Organizations

  • Boeing

Tags

Communities of Interest

  • Energy and Power Technologies
  • Weapons Technologies

DTIC Thesaurus Topics

  • Air Force
  • Air Force Facilities
  • Battery Chargers
  • Cable Assemblies
  • Cables
  • Communication Systems
  • Contracts
  • Government Furnished Equipment
  • Government Procurement
  • Governments
  • Guided Missiles
  • Launchers
  • Nomenclature
  • Power Supplies
  • Radio Frequency
  • Validation
  • Verification

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Naval Engineering and Maritime Security
  • Software Engineering

Technology Areas

  • Space