BL-221 70 Gc MAGNETRON PRODUCTION ENGINEERING MEASURE

Abstract

Efforts were continued on a program to establish a production engineering measure for 70-gc magnetrons. Along with the development of a broadband ceramic output window structure other activities initiated and/or pursued were as follows: (1) initiation of a design study program to determine the feasibility of making the BL-221 magnetron frequency tunable; (2) initiation of a study on rust and corrosion of external tube parts and effect of such corro sion on internal tube pressure or vacua; (3) completion of the anode hobbing facility set-up for development quantities; (4) continuation of effort to resolve theeating problems in the new test equipment.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Aug 06, 1962
Accession Number
AD0410284

Entities

People

  • Gary G. Riska

Tags

Communities of Interest

  • Air Platforms

DTIC Thesaurus Topics

  • Assembly
  • Construction
  • Contracts
  • Electron Tubes
  • Engineering
  • Frequency
  • Government Procurement
  • Ion Pumps
  • Magnetrons
  • Manufacturing
  • Materials
  • Procurement
  • Product Development
  • Production
  • Production Engineering
  • Test And Evaluation
  • Test Equipment

Fields of Study

  • Physics

Readers

  • Electronics Engineering
  • Software Engineering