BL-221 70 Gc MAGNETRON PRODUCTION ENGINEERING MEASURE
Abstract
Efforts were continued on a program to establish a production engineering measure for 70-gc magnetrons. Along with the development of a broadband ceramic output window structure other activities initiated and/or pursued were as follows: (1) initiation of a design study program to determine the feasibility of making the BL-221 magnetron frequency tunable; (2) initiation of a study on rust and corrosion of external tube parts and effect of such corro sion on internal tube pressure or vacua; (3) completion of the anode hobbing facility set-up for development quantities; (4) continuation of effort to resolve theeating problems in the new test equipment.
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 06, 1962
- Accession Number
- AD0410284
Entities
People
- Gary G. Riska