PRODUCTION ENGINEERING MEASURE, 2N914 AND 2N995.
Abstract
Contents: Lead Attach Improvement: change in metal system, small ball bonding, wire study, ultrasonic bonding, and dynamic and step stress testing; Preparation of substrate for epitaxial growth; Improve header plating; Eliminate gross particles; and Improve die attach.
Document Details
- Document Type
- Technical Report
- Publication Date
- Apr 30, 1963
- Accession Number
- AD0411130
Entities
People
- P. M. Weiler