PRODUCTION ENGINEERING MEASURE FOR RUGGEDIZED TAUT BAND SUSPENSION PANEL METERS PER SIGNAL CORPS TECHNICAL REQUIREMENTS. SCS-43A DATED 15 NOVEMBER 1960.

Abstract

Efforts were directed to pre-production testing of all ranges of the 180 degree meters, with the exception of the 15-0-15 ua range. Pre-produc tion testing of all meters is in progress. All sizes and meter ranges included in this contract have successfully passed the Group I and Group V tests of Specification SCS-43A. Reports covering the pre-production testing for ranges of 0-1 ma, and 0-50V of the 180 degree meters have been issued to USAEMSA. (Author)

Document Details

Document Type
Technical Report
Publication Date
Mar 31, 1963
Accession Number
AD0411913

Tags

DTIC Thesaurus Topics

  • Contracts
  • Coverings
  • Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Specifications

Readers

  • Electrical Engineering
  • Munitions and Ordnance Engineering
  • Software Engineering