CTLI INSTRUMENTATION FLIGHT PROOF TEST REPORT, (INTERIM CONFIGURATION) (MRCN 6301),
Abstract
One Airborne CTLI Section 39, S/N 0000003, was subjected to Pre-production Flight Proof Tests. These tests were made to demonstrate Reliability, Accuracy and Performance of the CTLI System under environmental conditions which will be encountered during launch and power flight, and/or handling, shipping, and storage to the test site area. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Sep 14, 1962
- Accession Number
- AD0411940
Entities
People
- E. Belin
Organizations
- Boeing