USSR INDUSTRIAL DEVELOPMENT: SOVIET PRECISION EQUIPMENT NO. 82.

Abstract

Contents: Delays in construction caused by defective reverse starters, by A. Zhurzherov Production of quality control instruments at ''Kontrol'pribor'', by N. Kiyanov Industrial achievement at Podol'sk cable plant Manufacture of microclimate regulator at Gomel' ''Elktroapparatur'' plant Poor quality television sets produced at Minsk radio plant Transmission of chromatic images by new experi mental device New production line at Ust'-Kamenogorsk plant Criticism of management practices at the Minsk radio plant, by M. Dmitrienko Development of production at Sumi electric microscope and electrical automatic equipment plant The new ''Minsk-2'' refrigerator The RVVT-M6 remote control device Production at first watch plant Advertisement for amplification services Planned increase and diversification of produc tion of lighting fixtures, by A. Presnyakov New oxygen-hydrogen station at Erevan electric bulb plant

Document Details

Document Type
Technical Report
Publication Date
Jun 26, 1963
Accession Number
AD0412022

Entities

Organizations

  • Joint Publications Research Service

Tags

DTIC Thesaurus Topics

  • Amplification
  • Automatic
  • Construction
  • Construction Equipment
  • Hydrogen
  • Microscopes
  • Newspapers
  • Optical Equipment
  • Optical Magnification Devices
  • Precision
  • Production
  • Quality Control
  • Regulators

Readers

  • Computer Science/Computer Engineering/Data Science/Digital Signal Processing.
  • Electrical Engineering
  • Industrial Economics