Schops Milestone 5, Volume 1.
Abstract
A series is outlined of validation and acceptance tests designed to show the capability of SCHOPS to schedule Satellite Control Facility (Satellite Tracking Annex and tracking station) operations. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 15, 1963
- Accession Number
- AD0412492
Entities
People
- M.a. Franks
Organizations
- System Development Corporation