COLLECTIVE PROTECTION EQUIPMENT FOR THE AN/MSG-4 SYSTEM. PHASE II AND III. DEVELOPMENT, FABRICATION AND TEST
Abstract
Effort was devoted primarily to the following items: (1) Fabrication of protective entrances for AN/MSQ-18 OC/CDG vehicles, AN/MPS-23 RET, AN/MSM-34, and AN/MSM-55 vehicles, AN/GSS-1D shelter, AN/TSQ-38 OC/CDG shelters, and AN/MSQ-28 WMC/RDPC vehicles; (2) Fabrication of four additional skid bases and storage boxes; (3) Fabrication and simulated installation of vehicle modification kits and CPE system installation kits; (4) Resolution of protective entrance door design problem; (5) Resolution of motor overload problem; (6) 400 CFM filter unit additional high and low temperature testing; (7) 400 CFM filter units and control panels acceptance testing; (8) AN/MSQ-18 vehicle and AN/GSS-1D shelter air leakage testing comple tool and (9) Preparation of 400 CFM filter unit purchase description.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 30, 1963
- Accession Number
- AD0412715
Entities
People
- L.w. Maples
Organizations
- Hughes Aircraft Company