PRODUCTION ENGINEERING MEASURE PbSe INFRARED DETECTORS - TYPE IR-200 FORM 2 PER SPECIFICATION SCS-34A.

Abstract

The program planning has been completed and is described. Engineering drawings and specifi cations for the detector have been completed in their unreleased form. Test equipment requirements have been reviewed and USAEMA has been asked to clarify items in question. Engineering samples of the detector are in fabrication and should be delivered on schedule. Quality control and production engineering familiarization with the detector is being accomplished during the engineering sample fabrication. The familiarization period is being used to establish the basic requirements for quality control procedures, manufacturing sequence, methods and time determinations, and materials requirements. (Author)

Document Details

Document Type
Technical Report
Publication Date
Mar 31, 1963
Accession Number
AD0412742

Entities

People

  • G.h. Cook

Tags

DTIC Thesaurus Topics

  • Detectors
  • Engineering
  • Engineering Drawings
  • Fabrication
  • Infrared Detectors
  • Management Planning And Control
  • Manufacturing
  • Optical Equipment
  • Production
  • Production Engineering
  • Quality Control
  • Test Equipment

Readers

  • Software Engineering
  • Systems Analysis and Design