PRODUCTION ENGINEERING MEASURE FOR TUBE TYPE 7587.

Abstract

A detailed account is presented of the effort expended in implementing the construction and debugging phases of each task. The account indi cates the degree of physical completion of each task in terms of photographs, and shows the results of specific debugging tests. This ac count shows that the construction phase of the truss grid winding machine task is completed, and debugging is under way. Evaluation of the head design for the exhaust machine task is com pleted, and final heads are in construction. The lead loader task is nearing completion of the construction phase. Also included is an indication of preparations in process for the production of engineering test samples of Tube Type 7587. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1963
Accession Number
AD0412889

Entities

People

  • W. Ackermann

Tags

DTIC Thesaurus Topics

  • Construction
  • Debugging
  • Engineering
  • Photographs
  • Photography
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Test And Evaluation

Readers

  • Instructional Design and Training Evaluation.
  • Software Engineering