MOLYBDENUM SHEET ROLLING PROGRAM.
Abstract
This report details the work accomplished under Contract NOas 59-6142-c during the twenty-first reporting period. The remaining lot of Mo-O.5%Ti 0.60 in. sheet was tested, and the balance of the extrusion stock has been converted to 0.20 in. sheet. Five TZM ingots melted during the last period were extruded and an additional five ingots were melted and extruded this period. InFab forging of all Phase III material is approximately 80% complete and 75% of this is in various stages of rolling. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 25, 1963
- Accession Number
- AD0413042