SITE ACCEPTANCE TEST PROCEDURES LAUNCH CONTROL FACILITY, MAFB,
Abstract
The purpose of Volume III of D2-9265 is to present the procedures for accepance testing required to assure the proper operation of the equipment within a Launch Control Facility. The scope of volume III consists of procedures for tests involving just those equipment which are assembled within the Launch Control Facility. Section 1 of this volume presents abstracts of the Operation Ground Equipment End-item test procedures for acceptance tests to be conducted at the Launch Control Facility. The abstracts consist of the following information: (1) De scription of the equipment. (2) Prior test requirements. (3) Reference to the Post-assembly test procedures document. (4) A general de scription of the Post-Assembly End-Item Test. Section 2 of this volume presents the detail step-by-step procedures for the integration testing of the Operational Ground Equipment within the Launch Control Facility. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 30, 1961
- Accession Number
- AD0413546
Entities
People
- D.j. Berard
Organizations
- Ohio State University