AUTOMATIC LIGHT AIRCRAFT READINESS MONITOR. VOLUME III. ADDENDUM - REINSTALLATION, PHASE II. TEST PROGRAM
Abstract
Discussions are presented on the installation procedures, calibration data, and results of tests on the modified Automatic Light Aircraft Readiness Monitor (ALARM) System Installation. The aircraft airframe was modified and new transmission and gear boxes were installed during the aircraft overhaul. In addition, the tail vibration sensor was relocated. The modified ALARM System virtually eliminates temperature drift, and the results of this phase compare favorably with the test program results.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1963
- Accession Number
- AD0414526