L3020 DATA PROCESSING SYSTEM RELIABILITY RUN RESULTS.
Abstract
The successful 30 day L3020 Reliability Run proved the feasibility of continuous scheduled opera tions of a duplexed system. Mean-Time-to-Error for the total system was 17.05 hours, while Mean Time-to-Interrupting-Failure was 34.09 hours. The test results indicated a Mean-Time-to-Sys tem-Recovery of 10.6 minutes. On-line failures during the test totaled three; two component failures and one solder joint failure. No major failures occurred during the test, nor were any major overhauls required. The 30 day test was a ''shakedown'' run as well as reliability test, and constituted a simulated operational trial of the system after preliminary acceptance by the FAA. The initial trial run also provided a personnel learning period with respect to equip ment operation and preventive maintenance pro cedures and techniques. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Nov 19, 1962
- Accession Number
- AD0414615
Entities
People
- G.f. Swygard
- W.h. Glaister