PRODUCTION ENGINEERING MEASURE - PbSe INFRARED DETECTORS - TYPE IR-200.

Abstract

Work accomplished is as follows: Production control procedures have been written for an in ventory control system and work order system. A preliminary Bill of Materials has been pre pared. A Flow Chart has been made to describe the sequence of operations. Manufacturing pro cedures have been written for those processes not defined by engineering specifications. A preliminary Quality Control Plan has been drafted and preliminary inspection procedures have been written. Design of special tooling has been started. Test equipment design param eters have been finalized. The first three (3) engineering samples have been delivered. Re visions have been made to the engineering draw ings, reflecting the change from the silicon window to the sapphire window. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 04, 1963
Accession Number
AD0416129

Entities

People

  • G.h. Cook

Tags

DTIC Thesaurus Topics

  • Control Systems
  • Detectors
  • Engineering
  • Failure Mode And Effect Analysis
  • Infrared Detectors
  • Manufacturing
  • Materials
  • Optical Equipment
  • Production
  • Production Control
  • Production Engineering
  • Quality Control
  • Test Equipment

Readers

  • Snow Cover Descriptors for Reptiles and Their Illustrations.
  • Software Engineering