DEVELOPMENT OF AN ELECTRON BEAM DUPLEXER.
Abstract
An S-band electron geam duplexer was designed, fabricated, and its assembly 90-percent completed by 31 May 1963. No unforeseen difficulties were encountered during this initial phase. It is expected that testing of the first S-band device will be accomplished in the second quarter, and that the results of these tests will provide suitable data to re-design an improved version, and to initiate its fabrication. Appended to this report is a discussion of the test results obtained from the C-band device which served as a guideline for producing the first S-band design emanating from this program. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 01, 1963
- Accession Number
- AD0416288
Entities
People
- A. Roemer
- I. Itzkan
Organizations
- Sperry Corporation