DESIGN, DEVELOPMENT AND FABRICATION OF BARO SWITCH, REMOTE XM-10; BAROSWITCH, PRESET XM-11; AND CONTROL BAROSWITCH SETTING: XT-4126.
Abstract
Six XM-10 baroswitches were placed on long term drift, to be read at 30 day intervals. One hundred sixty-one Revision Requests have been written aganst the XM-10 - XM-18 drawing sys tem, with 137 of them approved to date. The mounts were received and tested. iinvestigations into modified element setting mechanisms were conducted and are reported herein. The XT-4126A RAAROSETTER EVALUATION TEST PROGRAM WAS INITIATED WITH THE HUMIDITY, LOW TEMPERATURE AND HIGH TEM PERATURE TESTS, AS SPECIFIED. Results indicated that the setter functioned properly during the low temperature and high temperature tests,woowever, humidity testing produced failure of the neon indicator lamp lens, causing setter failure. Unit S/N 1027 M2 was shipped to Picatinny Arsenal, and units S/N 1023 L2 and 1028 M2 are awaiting Ordnance inspection. a99author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 13, 1963
- Accession Number
- AD0417074