7486 CERAMIC TRIODUCTION ENGINEERING MEASURE.

Abstract

Efforts were continued on the establishment of a production engineering measure for ceramic triodes. The vacuum system was delivered and installed. Prove-out is complete and processing schedules are being established. Design changes were incorporated in tubes. Life testing of these tubes was started and a lot was with drawn to be supplied as the second engineering sample. (Author)