EVALUATION OF LIGHTWEIGHT FIRE EXTINGUISHING SYS TEM UNDER SIMULATED FLIGHT CONDITIONS.
Abstract
A thorough review of the contract requirements has been made and a detailed schedule of ob jectives has been prepared to fulfill those re quirements. Materials are being procured. Spe cifications for the Test Apparatus have been prepared. A manufacturer has been selected to build the Test Apparatus and is preparing draw ings for final approval. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 07, 1963
- Accession Number
- AD0417905
Entities
People
- C.j. Cole