PROGRAM PLAN FOR CCN 81 TRANSPORTER-ERECTOR MODIFICATION,

Abstract

This document represents the program plan by which the Boeing Company will perform prelimi nary design and development for the incorporation of the 18,000 pound Maximum Axle Load Concept and its associated changes in the Minuteman transporter-erector. Topics covered herein include: change description; design; testing; subcontractor plan; logistics plan; manufactur ing plan; spares plan; documentation; program management; master program phasing and modifica tion schedule. System and equipment changes are described in limited detail only. The details of the system operation and equipment changes will be covered in the preliminary dreport which will be issued in a separate document. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 27, 1963
Accession Number
AD0418554

Entities

People

  • D.d. Eslinger
  • J.j. Phipps

Organizations

  • Boeing

Tags

DTIC Thesaurus Topics

  • Checkout Equipment
  • Contract Administration
  • Contractors
  • Contracts
  • Ground Support Equipment
  • Intercontinental Ballistic Missiles
  • Logistics
  • Military Equipment
  • Personnel Management
  • Program Management
  • Supply Chain
  • Supply Chain Integrity
  • Supply Chain Management
  • Test Equipment
  • Transporter Erectors

Readers

  • Snow Cover Descriptors for Reptiles and Their Illustrations.
  • Software Engineering