PRODUCTION ENGINEERING MEASURE ON HIGH PERVEANCE CATHODE-RAY TUBES.
Abstract
Specifications were reviewed and steps were taken to revise the technical specification. Pro duction tooling and procurement of raw materials were completed. Several samples are being built to test the production facility. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 08, 1963
- Accession Number
- AD0419527
Entities
People
- Edward T. Rate
Organizations
- General Electric