WS-133A STP III SPECIAL TEST REPORTS ELECTRICAL AND ELECTRONIC SYSTEMS.
Abstract
This test investigated a design change (DCV 97) proposed to minimize the failures of operational power supply drawers (P/N 25-22622-35) that have occurred at Wing I operational sites. These drawers are believed to have failed as a result of environmental control system and/or standby diesel generator malfunctions which caused the LF batteries to completely run down. In running down it is probable that LF Battery Set No. 1, which supplies power to ECS emergency fan, discharges before LF Battery Set No. 2, which supplies power to the LF Motor Generator Set. Under these conditions the power supply drawers are operated without cooling air and if this condition exists for several minutes the power supply drawers will overheat and fail. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 07, 1963
- Accession Number
- AD0421014
Entities
Organizations
- Boeing