MINUTEMAN WS - 133A WING II.

Abstract

This report is the test summary for the period 1 - 31 August 1963. It defines major test requirements, their degree of attainment, major program problems encountered and recommendations which may improve or accelerate the test program as defined in the Wing II VAFB Test Program Plan, BSD TR 63-29. It is not the purpose of this document to describe in detail each test performed, but rather, to report in general terms, the major test operations scheduled during the period, the major objectives attained during the period, and to describe briefly, the manner in which the program has progressed. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 14, 1963
Accession Number
AD0421522

Entities

Organizations

  • Boeing

Tags

DTIC Thesaurus Topics

  • Ballistic Missiles
  • Guided Missiles
  • Guided Weapons
  • Intercontinental Ballistic Missiles
  • Strategic Weapons
  • Surface To Surface Missiles

Readers

  • Aerospace Test and Evaluation
  • Business Analytics