HIGH VOLTAGE SILICON RECTIFIER STACKS.
Abstract
Efforts were continued on establishment of a production engineering measure on high voltage silicon rectifier stacks. Ten units were assembled and subjected to the first stages of preproduction testing. Efforts were made to arrange facilities for temperature storage, salt spray and life testing. A vibration tester was procured for vibration testing of these units and is performing satisfactorily. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1963
- Accession Number
- AD0421627
Entities
People
- Arnold Conn
- E. J. Diebold