HIGH VOLTAGE SILICON RECTIFIER STACKS.

Abstract

Efforts were continued on establishment of a production engineering measure on high voltage silicon rectifier stacks. Ten units were assembled and subjected to the first stages of preproduction testing. Efforts were made to arrange facilities for temperature storage, salt spray and life testing. A vibration tester was procured for vibration testing of these units and is performing satisfactorily. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 01, 1963
Accession Number
AD0421627

Entities

People

  • Arnold Conn
  • E. J. Diebold

Tags

Communities of Interest

  • Advanced Electronics

DTIC Thesaurus Topics

  • Engineering
  • High Voltage
  • Manufacturing Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Rectifiers
  • Vibration
  • Voltage

Readers

  • Aerospace Test and Evaluation
  • Electrical Engineering