WELDING OF REFRACTORY METALS.
Abstract
The purpose of the contract is defined and the program phases are outlined. The use of the InFab facility as an integral part of the program was reviewed. The literature and industrial survey was initiated and questionnaires were prepared. A master mailing list was compiled and is being checked for ommisions. Equipment for the welding program was purchased. Initial studies will begin with another apparatus now being assembled. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jan 01, 1963
- Accession Number
- AD0421974