WELDING OF REFRACTORY METALS.

Abstract

The purpose of the contract is defined and the program phases are outlined. The use of the InFab facility as an integral part of the program was reviewed. The literature and industrial survey was initiated and questionnaires were prepared. A master mailing list was compiled and is being checked for ommisions. Equipment for the welding program was purchased. Initial studies will begin with another apparatus now being assembled. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1963
Accession Number
AD0421974

Tags

DTIC Thesaurus Topics

  • Contracts
  • Integrals
  • Literature
  • Metals
  • Questionnaires
  • Refractory Metals
  • Surveys

Readers

  • Library and Information Science
  • Metallurgy
  • Systems Analysis and Design