PRODUCTION ENGINEERING MEASURE. RELIABILITY THRU PROCESS IMPROVEMENT (2N1506).

Abstract

Equipment and process investigations in the areas of collector attachment, contact metallizing, lead attachment and encapsulation have continued. The diffusion process is complete and ready to incorporate the advantages of the production line rearrangement now in progress. Significant improvements were achieved in gold evaporated contacts. Step-stress testing shows this process as being capable of providing the desired reliability level. (Author)

Document Details

Document Type
Technical Report
Publication Date
Jun 30, 1963
Accession Number
AD0422252

Entities

People

  • D. Kliem
  • F. Chien
  • Julie V. Logan
  • P. Kellow
  • R. Lamoureux

Tags

Communities of Interest

  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Accumulators
  • Attachment
  • Diffusion
  • Encapsulation
  • Engineering
  • Metallizing
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity
  • Reliability

Fields of Study

  • Engineering

Readers

  • Aerospace Test and Evaluation
  • Nanocomposite Materials Science
  • Surface Engineering/Surface Coating Technology.