PRODUCTION ENGINEERING MEASURE FOR TYPE FW-202 BARRIER GRID STORAGE TUBE.
Abstract
Efforts were continued on the establishment of a production engineering measure for the FW-202 barrier grid storage tube. The assembly of the first barrier grid tube was completed. All manufacturing processes with the exception of dynode oxidation were accomplished at least once. A monitor tube necessary for visual observation of barrier grid performance was completed and tested. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 24, 1963
- Accession Number
- AD0422482
Entities
People
- D. D. Duggan