PROJECT VULCAN RESEARCH AND DEVELOPMENT.
Abstract
This report describes the work performed through the period 1 June 1963 to 31 July 1963. The following projects and studies are discussed: (1) Gun Gas Drive. (2) Gun Gas Drive Spring Starter. (3) Gun Gas Drive Spring Starter Actuator. (4) Gun Bolt Inserts. (5) Front Track Bolts. (6) Lubricator (F104 installation). (7) Lubricant. (8) Boresighting and Target Study: production guns. (9) Range Firing Records. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Aug 31, 1963
- Accession Number
- AD0422493
Entities
Organizations
- General Electric