PROJECT VULCAN RESEARCH AND DEVELOPMENT.

Abstract

This report describes the work performed through the period 1 June 1963 to 31 July 1963. The following projects and studies are discussed: (1) Gun Gas Drive. (2) Gun Gas Drive Spring Starter. (3) Gun Gas Drive Spring Starter Actuator. (4) Gun Bolt Inserts. (5) Front Track Bolts. (6) Lubricator (F104 installation). (7) Lubricant. (8) Boresighting and Target Study: production guns. (9) Range Firing Records. (Author)

Document Details

Document Type
Technical Report
Publication Date
Aug 31, 1963
Accession Number
AD0422493

Entities

Organizations

  • General Electric

Tags

DTIC Thesaurus Topics

  • Actuators
  • Boresights
  • Control Systems
  • Fire Control System Components
  • Fire Control Systems
  • Lubricants
  • Mechanical Equipment
  • Production
  • Sights (Ordnance)

Readers

  • Technical Research and Report Writing.
  • Tribology (the study of the boundary interaction between sliding surfaces, lubrication, wear and friction).
  • ballistics.