PRODUCTION ENGINEERING MEASURE 2N914 AND 2N995.
Abstract
Contents: Lead Attach Improvement; a. Change in Metal System, b. Small Ball Bonding, c. Wire Study, d. Ultrasonic Bonding, e. Dynamic + Step Stress Testing; Preparation of Substrate for Epitaxial growth; Improve Header Plating; Eliminate Gross Particles.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jul 31, 1963
- Accession Number
- AD0422641
Entities
People
- P. M. Weiler