MINUTEMAN WS-133-A WING II, FINAL GROUND TEST REPORT FTM 625

Abstract

Receipt-through-launch operations are similar for each missile processed. As a result, many of the deficiencies (particularly in the fields of equipment and safety) being reported have been reported during previous tests. Exposure of any major W/S deficiencies still undetected will probably require special testing designed to explore the extremes of the various subsystems design envelopes. Unscheduled maintenance associated with Wing II testing has not received proper consideration. It is considered necessary to place greater emphasis upon coalition of unscheduled maintenance activities. Greater Air Force participation in test performance is required to achieve a test program consistent with the Wing II Program Concepts and to accomplish the Program Objectives stated in BSD-TR-63-29.

Open PDF

Document Details

Document Type
Technical Report
Publication Date
Jan 01, 1943
Accession Number
AD0423905

Entities

Organizations

  • Boeing

Tags

Communities of Interest

  • Human Systems
  • Space
  • Weapons Technologies

DTIC Thesaurus Topics

  • Actuators
  • Air Force
  • Air Force Personnel
  • C Band
  • Cable Assemblies
  • Computer Programming
  • Engineering
  • Human Factors Engineering
  • Instrumentation
  • Munitions
  • Range Safety
  • Test And Evaluation
  • Test Equipment
  • Test Sets
  • Timing Devices
  • Training
  • Weapon Systems

Fields of Study

  • Physics

Readers

  • Aerospace Test and Evaluation
  • Joint Military Operations and Doctrine.