AFSC PERT COST SYSTEM COST MODULE, VOLUME I. PROGRAM USER'S MANUAL,
Abstract
This document provides a user-oriented description of the IBM 7090 computer program which is used to process data for the AFSC PERT Cost Module. This program has been written for use with the IBSYS Basic Monitor System. The schedule information input to the program is an externally generated PERT/Time tape. The cost information input is obtained through the use of input forms, or externally generated tapes. These elements of cost data are maintained on a master tape which may be automatically updated. The program produces the reports described in the AFSC PERT Cost System Description Manual. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Oct 01, 1963
- Accession Number
- AD0424602
Entities
Organizations
- The Aerospace Corporation