EVALUATION OF RE-DISTRIBUTION OF LOAD ON LAUNCH FACILITY EMERGENCY BATTERIES.
Abstract
Presented are the results of tests conducted to evaluate the re-distribution of the loads on Battery Sets numbers 1 + 2 of the Minuteman launching site. The tests consisted of switching the launch facility over to emergency power, performing one launch sequence and allowing the Batteries to run out with the system at strategic alert. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 16, 1963
- Accession Number
- AD0425348