WING II MONTHLY SUMMARY NO. 7, WING III MONTHLY SUMMARY NO. 2,
Abstract
A cumultive summary of all deficiencies noted during the performance of MINUTEMAN test operations is presented. Deficiencies are categorized as follows: Equipment and facilities (E), Technical Orders (T.O.), Human Engineering (HE), Safety (S), Training (T), and Personnel Requirements (PR). The processing scheduling for the MINUTEMAN is also presented. (Author)
Document Details
- Document Type
- Technical Report
- Publication Date
- Dec 17, 1963
- Accession Number
- AD0425550
Entities
People
- L. Mcneely
Organizations
- Boeing