ACCEPTANCE SUMMARY REPORT FLIGHT TEST MISSILE 445, MODEL SPECIFICATION S-133-1007C.

Abstract

These data identify and describe the actual status of End Items, designated for First Article Customer Inspection or Team Acceptance review (Reference: AFBSD Exhibits 61-51 and 61-30). It include any Waivers or Deviations that exist or are required for Non-Conformance Items. Status reporting will be at the delivery level unless otherwise noted. Responsibility of maintenance to include Base Commitments is transferred to the Base Quality Control Planning Unit receiving the equipment. (Author)

Document Details

Document Type
Technical Report
Publication Date
Dec 30, 1963
Accession Number
AD0427606

Entities

People

  • Carl J. Lesh

Organizations

  • Boeing

Tags

Communities of Interest

  • Weapons Technologies

DTIC Thesaurus Topics

  • End Items
  • Inspection
  • Maintenance
  • Quality Control

Readers

  • Aerospace Test and Evaluation
  • Government Contracting/Procurement.