PRODUCTION ENGINEERING MEASURE TO IMPROVE PRODUCTION TECHNIQUES AND INCREASE THE RELIABILITY OF THE 2N328A TRANSISTOR.

Abstract

Efforts are reported on the work performed on improving the reliability of a PNP Silicon Alloy Transistor Type 2N328A. The PERT scheduling of the contract is reviewed and indicates that the work is on, or ahead, of schedule with only one exception, and this latter should cause no delay in contract performance. The etch wheel is already in fabrication; it will be installed in conjunction with larger furnace capacity and more dry boxes and testing stations. The recirculator has already been installed and its evaluation will be completed in the early part of the second quarter. An oxygen analyzer will be incorporated as part of the line at about the same time. Preliminary evaluations of a can welding shield give indications of improvements to be expected for this type of activity. Various methods of alumunum evaporation are being pursued as alternative processes for fabricating the devices. Step-stress testing with power dissipation as the stress has been almost completely evaluated as a convenient monitor to verify reliability improvements to be expected from the Equipment and Process Improvements. (Author)

Document Details

Document Type
Technical Report
Publication Date
Sep 30, 1963
Accession Number
AD0427668

Entities

People

  • E. N. Clarke
  • R. R. Rau

Organizations

  • National Semiconductor

Tags

Communities of Interest

  • Advanced Electronics
  • Materials and Manufacturing Processes

DTIC Thesaurus Topics

  • Alloys
  • Analyzers
  • Contracts
  • Dissipation
  • Electronic Equipment
  • Engineering
  • Evaporation
  • Fabrication
  • Management Engineering
  • Pert
  • Production
  • Production Engineering
  • Reliability
  • Scheduling (Production)
  • Silicon Alloys
  • Test And Evaluation
  • Transistors

Readers

  • Software Engineering
  • Thin Film Deposition Science.