PROTOTYPE DEVELOPMENT MODEL 385 AIR REFUELING STORE.

Abstract

Efforts have been concentrated on manufacture of additional prototype articles. Basic design has been completed; detail manufacturing drawings are in process. It is anticipated that procurement and tooling for long lead items will be started in the immediate future. The configuration for these stores has been developed from the value analysis task and will incorporate improvements as indicated by recent tests on the prototype stores. (Author)

Document Details

Document Type
Technical Report
Publication Date
Dec 09, 1963
Accession Number
AD0427835

Entities

People

  • C. V. Lassmann

Tags

DTIC Thesaurus Topics

  • Manufacturing
  • Models
  • Procurement
  • Prototypes
  • Refueling

Readers

  • Software Engineering