XC-142A VTOL TRANSPORT PROGRAM
Abstract
Progress on the XC-142A program is reported. Numerous test programs were initiated and some completed, including the basic wind tunnel tests of the 0.110 scale model and the control system bearing wear tests. The tooling effort reached its peak at the end of June with approximately 72% of the overall tooling task having been completed.
Document Details
- Document Type
- Technical Report
- Publication Date
- Jun 01, 1963
- Accession Number
- AD0428617
Entities
Organizations
- Vought