Z-5267 CERAMIC TETRODE, 40 WATTS AT 3000 MC. PRODUCTION ENGINEERING MEASURE.

Abstract

Production engineering measure is presented on a 40 watt, 3000 mc tetrode. During the sixth quarter, 116 tubes were constructed. A complete summary of the results obtained and the corrective measures taken is given in detail. The areas of redesign are listed and described in de tail. Major accomplishments for the quarter are listed and discussed. All preparation for the Preproduction test witnessing is complete. A plan for the next quarter is given which it is anticipated will conclude the program except for the planned 20 tube extended life study. The product performance adequately meets specification requirement; the tube is very stable with the appearance of life expectancy substantially beyond 1,000 hours. (Author)

Document Details

Document Type
Technical Report
Publication Date
Nov 30, 1963
Accession Number
AD0429043

Entities

People

  • H. D. Miller

Organizations

  • General Electric

Tags

DTIC Thesaurus Topics

  • Engineering
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity

Readers

  • Aerospace Test and Evaluation
  • Electronics Engineering
  • Technical Research and Report Writing.