PRODUCTION ENGINEERING MEASURE FOR ROLLED CERAMIC CAPACITORS.

Abstract

Some minor modifications were made to the electroding equipment, the winding equipment and the terminating machine. Short runs were first made with the equipment for calibration and adjustment. The ceramic tape required for the pilot run was made in a series of runs on the sheet forming machine. Sample units were made from each run to test the electrical and physical properties of the tape as a matter of control. The pilot run was started. (Author)

Document Details

Document Type
Technical Report
Publication Date
Dec 09, 1963
Accession Number
AD0429437

Entities

People

  • M. J. Shoemaker

Tags

DTIC Thesaurus Topics

  • Calibration
  • Capacitors
  • Ceramic Capacitors
  • Electronic Components
  • Electronic Equipment
  • Engineering
  • Physical Properties
  • Production
  • Production Engineering
  • Production Management Methods
  • Productivity

Readers

  • Computational Modeling and Simulation
  • Computer Science/Computer Engineering/Data Science/Digital Signal Processing.
  • Electrical Engineering