ELECTRO-INTERFERENCE TEST ON MINUTEMAN FIGURE ' 'A' ' 9164, POWER SUPPLY SET, LAUNCH CONTROL PROTECTIVE SYSTEM,

Abstract

The following RFI tests were performed: Conducted Generation, transient and steady-state, Radiation Generation, transient and steady-state. Conducted and radiated interference generation was measured and found to be, in most instances, above the limit. Temporary suppression measures were installed upon completion of RFI tests and certain modes were spot checked to determine the effectiveness of the suppression. In modes 1 and 4 the interference level was lowered appreciably, however, modes 2 and 5 showed little improvement. (Author)

Document Details

Document Type
Technical Report
Publication Date
Aug 08, 1962
Accession Number
AD0429888

Entities

People

  • I. A. Buffington

Organizations

  • Boeing

Tags

Communities of Interest

  • Energy and Power Technologies

DTIC Thesaurus Topics

  • Demographic Cohorts
  • Intercontinental Ballistic Missiles
  • Power Supplies
  • Radiation
  • Steady State

Fields of Study

  • Physics

Readers

  • Aerospace Test and Evaluation
  • Marine Hydrodynamics